Back
010566

Semi-inground swimming pool for the Micheli-Calandrini house

Residential

Types of mandate

Project and execution

Dates

Project : 2010 - 2011
Building permit: 2015
Construction site timeline: 2016 - 2017

Technical
informations

278 m2 of GFA, 1,060 m3 SIA
Pool 4m x 13 m

Location

Cologny

Collaborators

J. Leresche, V. Angiolini, S. Joye, 
E. Moeri, E. Cascioli

Project

In 2013, following the work on the outbuilding, we designed a semi-inground swimming pool project. By taking advantage of the slope that goes down to the lake, we have extended the esplanade, this making up the pool roof. A few days when the sun is at its zenith provide indoor light to avoid the feeling of a swimming pool on the ground. The pool is heated by solar collectors. Canadian wells were placed in the ground to temper the air drawn in by the one-piece unit. A retention basin has been placed at the back of the pool against the ground to store rainwater for the pool and the house. This water is used to water the garden of the estate. The drainage water is directed into a waste well to discharge the existing pipes. Ventilation control of the glass panes prevents heating and ventilation when they are open.

menu